Alma MI Water Treatment Plant
In Progress — 2026

Alma, MI — Water Treatment Plant

Client: LC United Painting Tank: 500K Gal. Toroellipse
  • Full mobilization, rigging, and engineered containment system
  • Structural welding and steel repairs
  • Exterior abrasive blasting to SSPC-SP10 Near-White Metal
  • High-performance epoxy primer and urethane topcoat — exterior
  • Interior wet abrasive blasting and NSF 61-compliant lining
  • Derigging, roof coating, disinfection, and site restoration
American Water Gary IN
Completed

American Water — Gary, IN

Client: American Water Tank: 2.5MG Elevated
  • Full containment and lead abatement per EPA RRP
  • Structural steel repairs and joint sealing
  • Interior and exterior blast and coating system
  • Sikaflex joint sealing, holiday testing, final disinfection
Wright-Patterson AFB
Completed

Wright-Patterson AFB — Fairborn, OH

Client: American Water (Federal) Tank: 200K Gal. Spheroid
  • Federal project — base access compliance and documentation
  • Full containment, structural repair, and joint sealing
  • Complete exterior and interior coating system installation
  • Roof coating, inspection, and final disinfection
Ashland OH Elevated Tower
Completed

City of Ashland, OH — Fluted Column

Client: City of Ashland Tank: 500K Gal. Fluted Column Elevated
  • Full exterior and interior blast and recoat
  • Structural steel repairs and welding
  • Epoxy zinc primer + intermediate + polyurethane topcoat
  • Sikaflex joint sealing, holiday testing, roof coating
Worthington Hills Columbus OH
Completed

Worthington Hills — Columbus, OH

Client: AQUA Water Tank: 300K Gal. Ground Storage
  • Full mobilization, rigging, and engineered containment
  • Interior and exterior abrasive blasting and coating
  • Structural steel repairs
  • Sikaflex joint sealing, holiday testing, site restoration